Scheduled time period

Sunday 26th March 2017 at 9:00am to Tuesday 28th March 2017 at 9:00am

Offshore production ramp down on gas day 26th March. Offshore production is planned to stop for 36-48 hours A 2 day ramp up to previous rates is expected once the works are complete

Planned offshore reduction at Elgin Franklin (Bacton SEAL). The flow reduction is due to works being carried out by a third party on the oil export route. The duration and timing are subject to change.

Unavailable Capacity
12mcm/d
Available Capacity
0mcm/d
Technical Capacity
12mcm/d