Scheduled time period

Friday 3rd September 2021 at 6:00am to Friday 24th September 2021 at 6:00am

Perenco Dimlington Terminal . Throughput has been reduced from approx. 0300hrs from offshore in preparation for the annual shutdown to commence from 0600hrs on the 3rd. Onshore elements are expected to conclude on the 17th September allowing a partial return to production (some 70-90mmscf estimate) during the final week of the REMIT post. Dimlington Terminal Export ceased at 0540hrs for the commencement of planned onshore and offshore activities. Onshore elements are expected to conclude on the 17th September allowing a partial return to production (some 70-90mmscf estimate). Latest update. The Terminal shutdown is slightly ahead of schedule. There is a chance of some partial production during the night shift of gas day 15th. Estimated between 50 - 70mmscf. Update: Dimlington Terminal commenced Export from 2105hrs. Partial production available approx. 70mmscf. Update: Offshore production has increased further within gas day 17th. Current production available approx. 95mmscf.

Perenco Dimlington Terminal reduced Throughput due to the planned annual shutdown

Unavailable Capacity
5.5mcm/d
Available Capacity
0mcm/d
Technical Capacity
5.5mcm/d
Further Information