Scheduled time period

Saturday 5th January 2019 at 1:00pm to Saturday 5th January 2019 at 3:14pm

Problem with the Air Driven Hydraulic Pump on the Sales Gas outlet valve to NTS. The existing pump will need to be isolated and replaced which will result in a SAGE Terminal shut down. The estimated shut down is 8/10 hours at present commencing around 1300 hrs on the 05-01-18

Unavailable Capacity
57mcm/d
Available Capacity
0mcm/d
Technical Capacity
57mcm/d
Further Information