Impacted time period
Sunday 24th May 2026 at 1:00pm to Monday 25th May 2026 at 1:00pmElgin-Franklin has tripped. Restart is currently unknown. Flows from Bacton SEAL will cease from 13:00hrs. Elgin Franklin flows at the Perenco terminal will also reduce by approximately 2.0 MCM/D.
Unavailable Capacity
4.4mcm/d
Available Capacity
0mcm/d
Technical Capacity
4.4mcm/d