Scheduled time period
Saturday 9th May 2026 at 5:00am to Sunday 24th May 2026 at 10:00pmFull outage. Injection.
Planned Outage
Unavailable Capacity
293.33GWh/d
Available Capacity
0GWh/d
Technical Capacity
293.33GWh/d