Scheduled time period

Friday 21st May 2021 at 6:00am to Wednesday 7th July 2021 at 6:00pm

These timings are the latest dates and are subject to change. They reflect the requirement to linepack sufficient gas to meet terminal operational parameters. There will be a period of reduced rates for a few days as production ramps up following restart.

Planned Maintenance

Unavailable Capacity
5.5mcm/d
Available Capacity
0mcm/d
Technical Capacity
5.5mcm/d