Scheduled time period
Saturday 31st July 2021 at 12:00am to Wednesday 4th August 2021 at 6:00pmDelivery to the grid resumed at 14:15. There will be a period of reduced rates either side of the shutdown as production ramps down & restarts
Planned Maintenance
Unavailable Capacity
5mcm/d
Available Capacity
0mcm/d
Technical Capacity
5mcm/d