Scheduled time period

Wednesday 21st September 2022 at 12:15pm to Friday 30th September 2022 at 12:00pm

2022-007-A-W-----CSLROUGH - CSL are intending to perform testing of the Rough field for withdrawal operations from (12:15; 21/09/2022). Withdrawal operations are not expected to impact gas production through the Easington Terminal.

Withdrawal commissioning

Unavailable Capacity
0mcm/d
Available Capacity
0mcm/d
Technical Capacity
2mcm/d