Scheduled time period
Friday 2nd June 2023 at 7:00am to Wednesday 7th June 2023 at 3:00pmThere will be a period of reduced rates either side of the shutdown as production ramps down and restarts.
Planned maintenance complete.
Unavailable Capacity
5mcm/d
Available Capacity
0mcm/d
Technical Capacity
5mcm/d