Scheduled time period

Friday 30th June 2023 at 5:00am to Saturday 1st July 2023 at 5:00am

There is no additional impact to gas production through the Easington Terminal under this REMIT.

Rough Withdrawal/Production REMIT This REMIT is to confirm CSL have undertaken work to increase the maximum injection rate into Rough and hence the quantity of gas which can be stored in a storage cycle. This results in an increase in the maximum production/withdrawal rate at maximum storage stock. There is no additional impact to gas production through the Easington Terminal under this REMIT.

Unavailable Capacity
0mcm/d
Available Capacity
9.6mcm/d
Technical Capacity
9.6mcm/d