Scheduled time period
Wednesday 3rd July 2024 at 6:00am to Thursday 4th July 2024 at 6:00amLiquid export rout is unavailable due to planned maintenance, therefore no gas export from Elgin Franklin. Approximately 2.5 MCM/D of Elgin Franklin gas going to the Perenco terminal will stop at the same time. Ramp down/ ramp up timings TBC
Unavailable Capacity
5.5mcm/d
Available Capacity
0mcm/d
Technical Capacity
5.5mcm/d