Impacted time period
Tuesday 27th November 2018 at 11:00am to Saturday 1st December 2018 at 3:00pmElgin Franklin production back to normal levels.
Unavailable Capacity
0mcm/d
Available Capacity
11.4mcm/d
Technical Capacity
11.4mcm/d