Impacted time period
Saturday 26th October 2024 at 8:00am to Sunday 27th October 2024 at 12:00pmElgin Franklin back to normal rates.
Unavailable Capacity
0mcm/d
Available Capacity
5.9mcm/d
Technical Capacity
5.9mcm/d