Impacted time period
Friday 20th June 2025 at 9:00pm to Saturday 21st June 2025 at 6:00pmTrain 1
Failure
Unavailable Capacity
66.98GWh/d
Available Capacity
220.8GWh/d
Technical Capacity
287.78GWh/d