Scheduled time period
Saturday 5th July 2025 at 2:00pm to Sunday 6th July 2025 at 5:00amAll Alwyn gas now going to NSMP terminal.
Unavailable Capacity
0mcm/d
Available Capacity
3.2mcm/d
Technical Capacity
3.2mcm/d