Scheduled time period
Friday 1st August 2025 at 9:00am to Friday 15th August 2025 at 9:00amCygnus will seize export for planned works during the gas days of Aug 1st up to and including Aug 14th. Export resumed Aug 15th.
Planned annual shutdown
Unavailable Capacity
4.3mcm/d
Available Capacity
0mcm/d
Technical Capacity
4.3mcm/d