Impacted time period
Saturday 30th August 2025 at 9:00pm to Monday 1st September 2025 at 6:00pmC3 failed to start
Failure
Unavailable Capacity
97.77GWh/d
Available Capacity
195.56GWh/d
Technical Capacity
293.33GWh/d