Scheduled time period
Monday 27th July 2026 at 5:00am to Saturday 8th August 2026 at 6:00pmAld. 5 Intervention & Sonar Survey
Planned Outage
Unavailable Capacity
0.33TWh
Available Capacity
2.75TWh
Technical Capacity
3.08TWh