Impacted time period
Saturday 29th November 2025 at 4:00pm to Sunday 30th November 2025 at 6:00amCulzean back to normal production levels.
Unavailable Capacity
0GWh/d
Available Capacity
110GWh/d
Technical Capacity
110GWh/d