Scheduled time period

Tuesday 27th January 2026 at 6:51pm to Saturday 7th February 2026 at 6:00am

ILI Pigging. Production now increasing to maximum rate until the next PIG is launched.

Gas export reduced during line pigging operations

Unavailable Capacity
2.4mcm/d
Available Capacity
6mcm/d
Technical Capacity
8.4mcm/d
Further Information