Impacted time period

Thursday 19th March 2026 at 7:00pm to Saturday 9th May 2026 at 5:00am

Reduced Flow

Failure

Unavailable Capacity
71.1GWh/d
Available Capacity
222.23GWh/d
Technical Capacity
293.33GWh/d
Further Information