Impacted time period
Sunday 24th May 2026 at 5:00pm to Friday 31st July 2026 at 7:00pmReduced Flow
Failure
Unavailable Capacity
71.1GWh/d
Available Capacity
222.23GWh/d
Technical Capacity
293.33GWh/d