Impacted time period
Friday 27th March 2026 at 8:00am to Saturday 28th March 2026 at 12:00pmElgin Franklin gas export has stopped, Investigations ongoing. flows into Bacton SEAL will stop at 0800. Elgin Franklin flows at the Perenco terminal will reduce by approximately 1.6 MCM/D at 0800. Restart time currently unknown
Unavailable Capacity
4.8mcm/d
Available Capacity
0mcm/d
Technical Capacity
4.8mcm/d