This is not the latest revision of this event. Please click here to see the latest update.

Impacted time period

Saturday 1st May 2027 at 12:00am to N/A

0.4786TWh Atwick storage unavailability. Maximum technical capacity during this period 2.4764TWh. Installed capacity 3.426TWh. Long term outage programme. Return date unknown.

Further Information