Impacted time period
Sunday 19th April 2026 at 10:00pm to Monday 20th April 2026 at 12:00pmElgin Franklin gas export has stopped, investigations ongoing. Reduced rates from Bacton SEAL with zero flows from midnight. Elgin Franklin flows at the Perenco terminal will reduce by approximately 1.7 MCM/D too.
Unavailable Capacity
4.5mcm/d
Available Capacity
0mcm/d
Technical Capacity
4.5mcm/d