Scheduled time period
Sunday 16th April 2028 at 5:00am to Saturday 22nd April 2028 at 5:00amTrain 1 Outage
Planned Outage
Unavailable Capacity
66.98GWh/d
Available Capacity
220.8GWh/d
Technical Capacity
287.78GWh/d