Scheduled time period
Tuesday 28th April 2026 at 3:45pm to Saturday 9th May 2026 at 5:00amProduction train 2 outage.
Planned Outage
Unavailable Capacity
66.98GWh/d
Available Capacity
220.8GWh/d
Technical Capacity
287.78GWh/d