Scheduled time period

Saturday 9th May 2026 at 6:00am to Friday 15th May 2026 at 6:00am

Reduction in flow to zero Mm3/d during the event. Rev. 3 ; Extended 48hrs

Planned maintenance for Shell Bacton Gas Terminal

Unavailable Capacity
27.3mcm/d
Available Capacity
0mcm/d
Technical Capacity
27.3mcm/d
Further Information