Impacted time period
Tuesday 26th May 2026 at 11:00am to Wednesday 27th May 2026 at 11:00amElgin Franklin has tripped. Flows from Bacton SEAL will cease from 11:00hrs. Elgin Franklin flows at the Perenco terminal will also reduce by approximately 2.1 MCM/D.
Unavailable Capacity
4.4mcm/d
Available Capacity
0mcm/d
Technical Capacity
4.4mcm/d