Impacted time period
Thursday 4th June 2026 at 10:58am to Friday 12th June 2026 at 6:00pmValve Leak
Failure
Unavailable Capacity
97.77GWh/d
Available Capacity
195.56GWh/d
Technical Capacity
293.33GWh/d