Impacted time period

Friday 12th June 2026 at 9:30pm to Saturday 13th June 2026 at 12:00am

Perenco Dimlington throughput at reduced rates for the next hour and expected to return to full rate thereafter.

Perenco Dimlington unplanned shutdown.

Unavailable Capacity
3.9mcm/d
Available Capacity
0mcm/d
Technical Capacity
3.9mcm/d
Further Information