Scheduled time period
Saturday 27th June 2026 at 6:00am to Saturday 11th July 2026 at 6:00amPerenco Dimlington throughput reduced with partial restart expected after initial 3 days offline period. Reduced rates from the estimated 4.8mcm to 3.2mcm during gas day 26th with further reductions overnight in preparations for the cessation of flows by 06:00hrs 27th. Partial restart progressing.
Perenco Dimlington planned maintenance shutdown.
Unavailable Capacity
2.2mcm/d
Available Capacity
2.6mcm/d
Technical Capacity
4.8mcm/d