Scheduled time period
Saturday 11th July 2026 at 6:00am to Wednesday 15th July 2026 at 3:00pmGas Export stop for Culzean. There maybe a small flow on the 11th depending on stock position. Gas Delivery forecast to start from the 15th but will be later in the day before normal rates.
Unavailable Capacity
100GWh/d
Available Capacity
0GWh/d
Technical Capacity
100GWh/d