Scheduled time period
Friday 8th November 2019 at 6:00am to Friday 15th November 2019 at 6:00pmCulzean export not expected to restart until the 14th November, export will be approximately 50% of technical capacity with rates ramping up to technical capacity on the 15th November
Unavailable Capacity
11mcm/d
Available Capacity
0mcm/d
Technical Capacity
11mcm/d