Scheduled time period
Saturday 1st August 2026 at 1:00am to Wednesday 5th August 2026 at 7:00pmThere will be a period of reduced rates either side of the shutdown as production ramps down and restarts
Planned maintenance
Unavailable Capacity
7mcm/d
Available Capacity
0mcm/d
Technical Capacity
7mcm/d