Scheduled time period

Monday 3rd August 2026 at 6:00am to Saturday 8th August 2026 at 6:00am

Elgin Franklin flows to start to ramp down on the 2nd August, restart planned for the 7th August with normal flows during gas day 8th August.

Due to planned maintenance at the Bacton Terminal. Elgin Franklin exports will stop. Approximately 1.7 MCM/D of Elgin Franklin gas going to the Perenco terminal will stop at the same time.

Unavailable Capacity
4.4mcm/d
Available Capacity
0mcm/d
Technical Capacity
4.4mcm/d