Impacted time period
Saturday 8th August 2026 at 6:00am to Sunday 9th August 2026 at 6:00amReduction in flow to zero Mm3/d during the event.
Unplanned offshore outage resulting in zero gas availability at Bacton.
Unavailable Capacity
27.3mcm/d
Available Capacity
27.3mcm/d
Technical Capacity
27.3mcm/d