Impacted time period
Saturday 5th September 2026 at 12:00am to Saturday 5th September 2026 at 9:00amCulzean export levels back to normal, flows at Teesside increasing.
Unavailable Capacity
96GWh/d
Available Capacity
20GWh/d
Technical Capacity
116GWh/d