Scheduled time period
Thursday 10th September 2026 at 9:00am to Tuesday 15th September 2026 at 6:00amElgin Franklin production is ramping up and expected to be at normal levels by gas-day 15th September.
Unavailable Capacity
3.1mcm/d
Available Capacity
3mcm/d
Technical Capacity
6.1mcm/d