Scheduled time period
Monday 21st September 2026 at 6:00am to Tuesday 22nd September 2026 at 6:00amReduced production from Elgin Franklin due to planned maintenance. Approximately 3 MCM/D of Elgin Franklin gas going to the Perenco terminal will stop at the same time.
Unavailable Capacity
0.8mcm/d
Available Capacity
2.6mcm/d
Technical Capacity
3.4mcm/d