Impacted time period
Friday 28th August 2026 at 11:43am to Sunday 15th November 2026 at 6:00pmReduced Flow
Failure
Unavailable Capacity
70.01GWh/d
Available Capacity
223.32GWh/d
Technical Capacity
293.33GWh/d