Scheduled time period
Monday 14th September 2026 at 6:00am to Friday 2nd October 2026 at 9:00amProduction back to normal levels.
Unavailable Capacity
6GWh/d
Available Capacity
110GWh/d
Technical Capacity
116GWh/d