Impacted time period
Friday 9th October 2026 at 1:00pm to Saturday 10th October 2026 at 1:00pmElgin Franklin production has ceased. Flows through Bacton SEAL are reducing and will stop at 13:00hrs. Elgin Franklin flows at the Perenco terminal will reduce by approximately 1.8 MCM/D too.
Unavailable Capacity
4.4mcm/d
Available Capacity
0mcm/d
Technical Capacity
4.4mcm/d