Impacted time period
Tuesday 10th November 2026 at 3:30am to Tuesday 10th November 2026 at 10:50amPerenco Dimlington reduced throughput due on unplanned onshore outage. Restart procedures ongoing at Dimlington. Gas export resumed from Dimlington at 1050hrs.
Perenco Dimlington reduced terminal throughput.
Unavailable Capacity
0mcm/d
Available Capacity
4.1mcm/d
Technical Capacity
4.1mcm/d