Scheduled time period
Sunday 22nd November 2026 at 5:00am to Saturday 28th November 2026 at 6:00pmGC No.4.
Planned Outage
Unavailable Capacity
7.5GWh/d
Available Capacity
22.5GWh/d
Technical Capacity
30GWh/d