Scheduled time period
Sunday 15th November 2026 at 5:00am to Saturday 21st November 2026 at 6:00pmPlanned Outage
Unavailable Capacity
22.5GWh/d
Available Capacity
7.5GWh/d
Technical Capacity
30GWh/d