Scheduled time period

Friday 22nd September 2023 at 6:00am to Saturday 23rd September 2023 at 9:40pm

Reduced Perenco Dimlington terminal gas export due to planned maintenance activities. Initial ramp down on 21/09/23 06:00hrs of 0.5MCM/d, followed by further reduction on 22/09/23 06:00hrs of 4.1MCM/d. Ramp up expected to commence 24/09/23 06:00hrs. Preparations are currently underway to resume export with available offshore production. Full production not yet available. Gas export to the NTS from Dimlington Terminal resumed from approx 1840hrs, and will be gradually ramped up over the next few hours. All available fields are now online and flows will be maximised over the remainder of the gas day.

Perenco Dimlington reduced throughput due to planned maintenance activities.

Unavailable Capacity
2.5mcm/d
Available Capacity
1.85mcm/d
Technical Capacity
4.25mcm/d