Scheduled time period

Friday 1st August 2025 at 6:00am to Tuesday 26th August 2025 at 6:00am

Elgin Franklin flows to start to ramp down from the 28th July. Ramp up to normal rates will take 2 days

Due to planned maintenance at the Bacton Terminal. Elgin Franklin exports will stop. Approximately 2.0 MCM/D of Elgin Franklin gas going to the Perenco terminal will stop at the same time

Unavailable Capacity
5mcm/d
Available Capacity
0mcm/d
Technical Capacity
5mcm/d
Further Information