This is not the latest revision of this event. Please click here to see the latest update.

Scheduled time period

Monday 28th July 2025 at 6:00am to Tuesday 26th August 2025 at 6:00am

Ramp up to normal rates will take 2 days

Elgin Franklin exports will ramp down on the 27th August with flows expected to stop to National Grid by the start of gas day 28-Aug-2025. Approximately 1.9 MCM/D of Elgin Franklin gas going to the Perenco terminal will stop at the same time

Unavailable Capacity
5mcm/d
Available Capacity
0mcm/d
Technical Capacity
5mcm/d
Further Information