Scheduled time period
Tuesday 1st September 2026 at 6:00am to Thursday 24th September 2026 at 6:00amReduced Perenco Bacton throughput. Phasing down production between 01/09/2026 - 05/09/2026. Zero production between 05/09/2026 - 13/09/2026. Partial reinstatement expected from 13/09/2026 onwards; full reinstatement by 24/09/2026.
Perenco Bacton Terminal Planned maintenance shutdown
Unavailable Capacity
8mcm/d
Available Capacity
0mcm/d
Technical Capacity
8mcm/d